Construction Change Order Template (Free + Editable) - OneCrew

Construction Change Order Template (Free + Editable)

Get an editable construction change order template, then price the change, log the schedule hit, and get it signed before your crew rolls out.

Written by
Team OneCrew
Published: Oct 5, 2026
·
11 min read

Table of contents

A verbal "go ahead and fix that soft spot" feels like approval. Your invoice will disagree. A construction change order template turns that conversation into a signed document in about 10 minutes.

We built the template below from the standard AIA form, Caltrans' change order manual, and the paperwork commercial and municipal owners ask paving contractors for.

You'll get the editable form, a walkthrough of all 11 fields, a filled-in example from a parking lot job, and the pricing math that protects your margin.

Construction Change Order Template: 11 Fields

Every construction change order runs the same 11 fields, and here's what belongs in each one:

  1. Project and contract identifiers: project name, site address, contract number, contract date, and the owner's legal entity name
  2. Change order number and date: sequential numbering, with revisions written as CO-03R1 so both versions stay in the file
  3. Description of the change: plan and spec language, with station numbers, square footage, depth, and mix designation
  4. Reason for the change: owner-directed, unforeseen condition, design omission, code, or weather, since the reason drives who pays
  5. Supporting documents and photos: RFI numbers, plan sheets, takeoffs, supplier quotes, and dated photos, all named on the form
  6. Cost breakdown by line item: labor, material, equipment, and subcontractor, with units and unit prices on every line
  7. Margin on the changed work: your target margin applied as a divisor, inside whatever cap the changes clause allows
  8. Revised contract sum: original sum, prior approved changes, this change order, and the new contract total
  9. Schedule impact: working days added and the revised completion date, even when the answer is zero days
  10. Signatures and dates: owner, contractor, and the architect or engineer when the contract calls for one
  11. The clause that closes the file: a line stating this change order is full compensation, including the time extension

What Is a Construction Change Order Template?

A construction change order template is a reusable form that documents a change to a signed contract: the added or deleted work, the price, the schedule impact, and the signatures that make it binding. You fill in the blanks, both sides sign, and the document joins the original contract as an amendment.

Change orders show up on most jobs. AIA Contract Documents ran text analytics on 892,457 change orders across 18,229 completed projects and found the typical job carries between 1.7 and 11.29 change orders depending on its size.

Download the Construction Change Order Template (Editable)

The construction change order template opens as a view-only Google Doc, which keeps the master copy clean for the next contractor who needs it. Your own copy is fully editable, and making one takes about thirty seconds:

  1. Open the template, click File, then click Make a copy.
  2. Save the copy to your own Google Drive or a shared team folder.
  3. Rename it with your job and change order number, along the lines of "Northside Lot CO-02."
  4. Delete the How to Use This Template block at the top before the form goes anywhere near a customer.
  5. Fill in Sections 1 through 11, then export to PDF for signatures.

Prefer MS Word? Open your copy, click File, then Download, then Microsoft Word (.docx). The tables, checkboxes, and section numbering survive the export intact.

The 11 Fields Your Construction Change Order Template Needs

Owners push back on four of these more than the rest: There’s the description, the cost breakdown, the margin, and the schedule days. The other seven exist to make those four hard to argue with six months later.

1. Project and contract identifiers

Write the project name, site address or parcel number, original contract number, and the date you signed that contract.

2. Change order number and date

Number your change orders sequentially and never reuse a number after a revision. Call the revision CO-03R1 and keep both versions in the file.

3. Description of the change

Describe the work using the same language as the plans and specs: station numbers, area in square feet, depth in inches, mix designation.

4. Reason for the change

State what caused the change and who originated it: owner-directed addition, unforeseen site condition, design omission, code requirement, or weather.

5. Supporting documents and photos

List every attachment by name: RFI number, plan sheet, spec section, quantity takeoff, supplier quote, and dated site photos.

6. Cost breakdown by line item

Break the price into the same buckets you bid with: labor, material, equipment, and subcontractor.

7. Margin on the changed work

Apply your target margin to the direct cost and read your contract's changes clause before you do.

8. Revised contract sum

Give the owner four lines: original contract sum, net change from previously approved change orders, this change order amount, and the new contract sum.

9. Schedule impact

Enter the working days added and the new substantial completion date, even when the honest answer is zero days.

10. Signatures and dates

Collect a printed name, title, signature, and date from the owner, from you, and from the architect or engineer when your contract calls for one.

11. The clause that closes the file

Add a short paragraph stating that this change order represents full compensation for the described work, including any time extension.

How to Price a Construction Change Order Without Giving Up Margin

Price the change off your own cost data, then apply margin as a divisor. Margin and markup are different math, and the gap between them is real money.

Construction Change Order Template Example (Filled In)

Here's the form on a job most paving contractors will recognize. A 32,000 sq ft parking lot mill and overlay at $184,500. Your crew starts milling, the truck court fails under the loader across roughly 6,200 sq ft, and nobody bid subgrade repair.

Line item Detail Amount
Labor 4-person crew, 2 days $3,840.00
Equipment Skid steer, roller $1,450.00
Aggregate base 280 tons at $28 $7,840.00
Geotextile fabric 6,200 sq ft at $0.42 $2,604.00
Trucking (sub) Haul and disposal $1,200.00
Direct cost Subtotal $16,934.00
Margin at 22% Price (÷ 0.78) minus cost $4,776.26
Change order total CO-02 $21,710.26

Fill out the corresponding contract sum lines:

5 Mistakes That Make a Construction Change Order Template Useless

  1. Starting work on a verbal approval
  2. Leaving the schedule line blank
  3. Bundling unrelated changes onto one form
  4. Pricing off a gut number
  5. Letting the form sit unsigned

When a Change Order Template Stops Being Enough

A template handles one change on one job beautifully. Twenty active jobs with three changes each means 60 documents, 60 revised contract sums, and 60 opportunities for a crew to show up working from a superseded scope.